Could a complete design brief reduce quote revisions caused by missing dimensions or use requirements?
A design intake checklist covering dimensions, intended use, material constraints, tolerances, deadline, and approved reference files.
What we could measure together
Measure: Quote revisions caused by missing approved requirements (revisions/project).
Start with 10 consecutive eligible tasks, or all tasks in one week; retain exceptions and record the sample size.
Acceptance boundary: Never infer safety-critical tolerances or material suitability; the designer validates the brief.